Dates: Dec 2010 – Mar 2011
Estimated Budget: $900,000
Summary: Resurfacing, restriping and upgrading lighting
During
After
Budget: $175,000
Summary: 14 new disabled parking spaces will be added to the center of campus
Dates: August 2010
Summary: Concrete pads poured for waiting passengers.
Dates: July – August 2010
Summary: Portions of 40 b, c and d are being renovated. Repairing subgrade and potholes.
Dates: June – August 2010
Summary: Lot 70 is being resurfaced. New drainage flume added to help surface drainage.
Dates: May 17, 2010 – August 2010
Budget: $2 million
Summary: Improve drainage and landscaping to include protection of existing oak trees. Improve drive lanes. Replace existing parking lot subgrade and surface. Lighting will also be added for improved safety.
Before
Budget: $95,000
Summary: Picnic areas added. Nine tables with grills and benches will be added.
Dates: January 2010- May 2010
Budget: $1.2 million
Summary: These 3 lots will become 1 lot to decrease number of intersections and make 4-way stop. This will improve traffic flow and safety at Chandler and Olsen. Remove existing asphalt in 100j and replace with concrete. Improve ADA compliance in 100j and k.
Project completion: January 2010
Budget: $5000
Summary: This lot is close to the center of campus. The existing lot was reduced by construction in the area. Transportation Services removed old striping and curb painting before increasing the number of ADA spaces within the lot. Disabled parking signs have been added along with new paint and wheel stops.