Project dates: April – January 2018
Cost: $1,470,070
Summary: The project was undertaken to:
- reconstruct Adriance Lab Road and Horticulture Road in concrete;
- add sidewalks and buffered bike lanes to both sides of Adriance Lab Road;
- add compliant accessible ramps at all crosswalks along Adriance Lab and Horticulture Roads;
- construct a sidewalk along the east side of Discovery Road between John Kimbrough Boulevard and Horticulture Road;
- add crosswalks on Discovery Road where it intersects with Enterprise Avenue and at West Campus Boulevard;
- reconstruct the entrances to Lots 18 and 98;
- add campus standard lighting along the length of the project;
- add improved drainage to Adriance Lab Road;
- extend the multi-use path currently on Horticulture Road to the east to connect to other west campus infrastructure.
Before:
After:
Read more about the Adriance Lab project